Karin from Sharon writes
Read how to do outside perimeter. Do we need to drill basement floor and treat same way as outside concrete? (Established infestation.)
Yes, you can apply Termidor to drilled holes in your basement. You would drill along the inside perimeter 12 in apart. Be sure to apply 4 gallons mixed solution per 10 linear feet. The only permissible ways Termidor can be used indoors is when it is applied to drilled holes or wall voids.
Answer last updated on: 04/12/2016