Product Q&A

« See More Q&A's

Danny from Elkin, Nc writes

How far apart do I drill holes in concrete slab to apply Termidor SC?

Answer:

The holes should be 2" from the foundation wall and 10-12" apart. You will apply the finished solution at 4 gallons every 10 lineal feet. You will mix 0.8 fl oz of Termidor SC per gallon in a 5 gallon bucket (4 gallons of water and 3.2 fl oz of Termidor SC).

Answer last updated on: 09/12/2016

Was this answer helpful to you? Yes No

3 of 3 people found this answer helpful.