Deldrick from Grand Forks, Nd writes
What areas should be covered? Do you apply to the outside of the building also?
When spraying Temprid SC indoors, you will spray along the baseboards and cracks and crevices in all areas of the building. Temprid SC can also be sprayed outdoors around the perimeter of the structure. You will mix 8 mL per gallon of water in a pump sprayer. Temprid SC will last up to 90 days indoors and 30 days outdoors.
Answer last updated on: 10/25/2014