Pete from Fayetteville, Ga. writes
I drilled to concrete and put a gallon in each one and never did fill the hole.
You will drill a hole 2" from the foundation wall 10-12" apart and disperse 4 gallons of finished solution (Adonis 2F diluted with water) every 10 lineal feet of drilled holes. The holes should be 3/8" by 18" deep. You can plug them with Trebor plugs or with a concrete patch.
Answer last updated on: 05/14/2014